Our use of cookies

We use strictly necessary cookies to make our site work. These cookies enable core functionality such as security, network management, and accessibility. The cookies collect information in a way that does not directly identify anyone. For more information on how these cookies work please see our privacy policy.

To agree to our use of analytical cookies, click the 'Accept cookies' button. No, give me more information.
Accept cookies Reject analytical cookies Manage cookies
 

B1811 Stone Bypass River Bridge

Following a comprehensive inspection, the deck waterproofing system of B1811 Stone Bypass River Bridge has failed. Staffordshire County Council Highways team is undertaking essential work to both replace the deck waterproofing system and strengthen the weak service bays. The works will widen the existing narrow footpaths for combined pedestrian cyclist use and improve bridge water management to prolong the bridge service life.

The works are deemed essential to ensure the bridge meets minimum national highway standards, and to ensure future public safety.

A51 Stone Bypass River Road will have one lane closed to vehicles under temporary traffic lights, (estimated 26-week duration). Pedestrian access will be maintained where possible for the duration of the works.

 

When are the works taking place?

19 August 2024 subject to obtaining all relevant statutory consents. When will the works be completed?

 

When will the works be completed?

February 2025, (estimated 26 weeks works duration), subject to obtaining all relevant statutory consents, (allowing two weeks for mobilisation / demobilisation).

 

Will I be able to access my home/business?

Yes.

 

What effect could the works have on me?

It will be necessary to close one lane of traffic on the A51 Stone Bypass River Road. The works may lead to delays but, pedestrian access will be maintained where possible.

 

How you can help us

You can help us to get the job done with the minimum of fuss by following this advice:

  • Please keep children away from the works to ensure their safety.
  • Please drive appropriately through the works.
  • Check your shoes before entering your property or car to make sure there is no bitumen from the works.

There are no results that match your search criteria